Abd AL - Hadi Hassan, H., Nayef Hashem, H. (2013). DETERMINE THE OPTIMAL PRODUCTION BATCH USING THE LINEAR PROGRAMMING AN EMPIRICAL STUDY IN AL- KASHAIN PLANT FOR FLOOR TILES / BASRA. , 26(7), 0-0.
Hassan Abd AL - Hadi Hassan; Hashem Nayef Hashem. "DETERMINE THE OPTIMAL PRODUCTION BATCH USING THE LINEAR PROGRAMMING AN EMPIRICAL STUDY IN AL- KASHAIN PLANT FOR FLOOR TILES / BASRA". , 26, 7, 2013, 0-0.
Abd AL - Hadi Hassan, H., Nayef Hashem, H. (2013). 'DETERMINE THE OPTIMAL PRODUCTION BATCH USING THE LINEAR PROGRAMMING AN EMPIRICAL STUDY IN AL- KASHAIN PLANT FOR FLOOR TILES / BASRA', , 26(7), pp. 0-0.
Abd AL - Hadi Hassan, H., Nayef Hashem, H. DETERMINE THE OPTIMAL PRODUCTION BATCH USING THE LINEAR PROGRAMMING AN EMPIRICAL STUDY IN AL- KASHAIN PLANT FOR FLOOR TILES / BASRA. , 2013; 26(7): 0-0.