N. Sayle, K., A. Al- Janabi, I. (2008). Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque). , 1(1), 143-159. doi: 10.37649/aengs.2007.14260
Khmis N. Sayle; Ibrahim A. Al- Janabi. "Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque)". , 1, 1, 2008, 143-159. doi: 10.37649/aengs.2007.14260
N. Sayle, K., A. Al- Janabi, I. (2008). 'Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque)', , 1(1), pp. 143-159. doi: 10.37649/aengs.2007.14260
N. Sayle, K., A. Al- Janabi, I. Study of Quality Control of A Survey Work in Construction Projects Case Study ( AL Rahman Mosque). , 2008; 1(1): 143-159. doi: 10.37649/aengs.2007.14260


Journal Management System. Powered by iJournalPro.com