Alsamman, T., Alsawaf, M. (2005). THE REQUIREMENTS FOR ESTABLISHING A TOTAL PRODUCTIVE MAINTENANCE PROGRAM FIELD STUDY IN TEXTILE AND YARN FACTORY IN MOSUL. , 27(79), 9-26. doi: 10.33899/tanra.2005.161597
Thaeir Alsamman; Mahfood Alsawaf. "THE REQUIREMENTS FOR ESTABLISHING A TOTAL PRODUCTIVE MAINTENANCE PROGRAM FIELD STUDY IN TEXTILE AND YARN FACTORY IN MOSUL". , 27, 79, 2005, 9-26. doi: 10.33899/tanra.2005.161597
Alsamman, T., Alsawaf, M. (2005). 'THE REQUIREMENTS FOR ESTABLISHING A TOTAL PRODUCTIVE MAINTENANCE PROGRAM FIELD STUDY IN TEXTILE AND YARN FACTORY IN MOSUL', , 27(79), pp. 9-26. doi: 10.33899/tanra.2005.161597
Alsamman, T., Alsawaf, M. THE REQUIREMENTS FOR ESTABLISHING A TOTAL PRODUCTIVE MAINTENANCE PROGRAM FIELD STUDY IN TEXTILE AND YARN FACTORY IN MOSUL. , 2005; 27(79): 9-26. doi: 10.33899/tanra.2005.161597


Journal Management System. Powered by iJournalPro.com