Al Samman, D., Wahab, R. (2012). The Requirements of Total Production Maintenance and Role of Achieving the Competitive Priorities: A Application Study on Hammam al Alil cement Factory in Mosul. , 34(109), 9-28. doi: 10.33899/tanra.2012.161985
Dr.Thaeir Al Samman; Riyad Wahab. "The Requirements of Total Production Maintenance and Role of Achieving the Competitive Priorities: A Application Study on Hammam al Alil cement Factory in Mosul". , 34, 109, 2012, 9-28. doi: 10.33899/tanra.2012.161985
Al Samman, D., Wahab, R. (2012). 'The Requirements of Total Production Maintenance and Role of Achieving the Competitive Priorities: A Application Study on Hammam al Alil cement Factory in Mosul', , 34(109), pp. 9-28. doi: 10.33899/tanra.2012.161985
Al Samman, D., Wahab, R. The Requirements of Total Production Maintenance and Role of Achieving the Competitive Priorities: A Application Study on Hammam al Alil cement Factory in Mosul. , 2012; 34(109): 9-28. doi: 10.33899/tanra.2012.161985


Journal Management System. Powered by iJournalPro.com