[1] M. A. J. Q. Franco, P. Pawar, and X. Wu, “Green building policies in cities: A comparative assessment and analysis,” Energy Build, vol. 231, p. 110561, 2021, doi: https://doi.org/10.1016/j.enbuild.2020.110561.
[2] A. Soekiman, K. Pribadi, B. Soemardi, and R. Wirahadikusumah, “Factors Relating to Labor Productivity Affecting the Project Schedule Performance in Indonesia,” Procedia Eng, vol. 14, pp. 865–873, Dec. 2011, doi: 10.1016/j.proeng.2011.07.110.
[3] M. R. Kadir, W. P. Lee, M. S. Jaafar, S. Sapuan, and A. Ali, “Factors affecting construction labour productivity for Malaysian residential projects,” Structural Survey, vol. 23, pp. 42–54, Feb. 2005, doi: 10.1108/02630800510586907.
[4] K. El-Gohary and R. Eskander, “Factors Influencing Construction Labor Productivity in Egypt,” Journal of Management in Engineering, vol. 30, pp. 1–9, Jan. 2014, doi: 10.1061/(ASCE)ME.1943-5479.0000168.
[5] A. Visca, L. Di Gregorio, E. Clagnan, and A. Bevivino, “Sustainable strategies: Nature-based solutions to tackle antibiotic resistance gene proliferation and improve agricultural productivity and soil quality,” Environ Res, vol. 248, p. 118395, 2024, doi: https://doi.org/10.1016/j.envres.2024.118395.
[6] A. Enshassi, S. Mohamed, and P. Mayer, “Factors affecting labour productivity in building projects in the Gaza strip,” JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, vol. 13, pp. 245–254, Dec. 2007, doi: 10.3846/13923730.2007.9636444.
[7] F. M. Al-Zwainy, A. Mohammed, and H. Aljumaily, “Using Multivariable Linear Regression Technique for Modeling Productivity Construction in Iraq,” Open Journal of Civil Engineering, vol. 03, pp. 127–135, Jan. 2013, doi: 10.4236/ojce.2013.33015.
[8] S. Durdyev and J. Mbachu, “On-site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures,” Australasian Journal of Construction Economics and Building, vol. 11, pp. 18–33, Sep. 2011, doi: 10.5130/ajceb.v11i3.2120.
[9] N. Ailabouni, N. Painting, and P. Ashton, “Factors affecting employee productivity in the UAE construction industry,” Association of Researchers in Construction Management, ARCOM 2009 - Proceedings of the 25th Annual Conference, pp. 555–564, Jan. 2009.
[10] R. Eskander, S. Hafez, E. Morgan, M. Mohammed, and E. Ahmed, “Critical factors affecting construction labor productivity in Egypt,” Feb. 2014.
[11] A. J.Dakhil, Z. M.Naji, and S. K.Faleh, “Factors Affecting Construction Labour Productivity in Iraq Using Basra City As a Case Study,” Kufa Journal of Engineering, vol. 8, no. 3, pp. 55–75, 2017, doi: 10.30572/2018/kje/8031157.
[12] A. Makulsawatudom, M. Emsley, and K. Sinthawanarong, “Critical Factors Influencing Construction Productivity in Thailand,” Construction, vol. 14, no. 3, pp. 1–6, 2004.
[13] B. Hickson and L. Ellis, “Factors affecting Construction Labour Productivity in Trinidad and Tobago,” The Journal of the Association of Professional Engineers of Trinidad and Tobago, vol. 42, Apr. 2014.
[14] H. Jang, K. Kim, J. H. Kim, and J. Kim, “Labour productivity model for reinforced concrete construction projects,” Construction Innovation: Information, Process, Management, vol. 11, pp. 92–113, Jan. 2011, doi: 10.1108/14714171111104655.
[15] I. Mahamid, “Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective,” Australasian Journal of Construction Economics and Building, vol. 13, p. 45, Jun. 2013, doi: 10.5130/ajceb.v13i2.3194.
[16] A. M. R. Mahjoob, A. M. Burhan, R. A. R. Ibraheem, O. A. Al-Juboori, and H. A. Rashid, “The adoption of green management in Iraqi construction industry: The challenges and benefits,” Periodicals of Engineering and Natural Sciences, vol. 10, no. 5, pp. 101–114, 2022, doi: 10.21533/pen.v10i5.3324.
[17] N. Shrestha, “Factor Analysis as a Tool for Survey Analysis,” Am J Appl Math Stat, vol. 9, no. 1, pp. 4–11, 2021, doi: 10.12691/ajams-9-1-2.
[18] P. O. Olomolaiye, A. K. W. Jayawardane, and F. Harris, Construction Productivity Management. in Chartered Institute of Building Series. Longman, 1998. [Online]. Available: https://books.google.iq/books?id=fzFPAAAAMAAJ
[19] K. J. Shashank, S. Hazra, and K. N. Pal, “Analysis of Key Factors Affecting the Variation of Labour Productivity in Construction Projects,” 2014. [Online]. Available: https://api.semanticscholar.org/CorpusID:15553119
[20] P. Bijalwan, A. Gupta, A. Johri, and M. Asif, “The mediating role of workplace incivility on the relationship between organizational culture and employee productivity: a systematic review,” Cogent Soc Sci, vol. 10, no. 1, p. 2382894, Dec. 2024, doi: 10.1080/23311886.2024.2382894.
[21] T. H. Randolph and N. C. L., “Quantitative Effects of Construction Changes on Labor Productivity,” J Constr Eng Manag, vol. 121, no. 3, pp. 290–296, Sep. 1995, doi: 10.1061/(ASCE)0733-9364(1995)121:3(290).
[22] J. L. Davis, “Science , Fiction , and the Hollywood Machine : Creators and Consultants , Consensus and Conflict,” 2022.
[23] B. Nikmehr, M. R. Hosseini, I. Martek, and E. K. Zavadskas, “B Nikmehr; M Hosseini; I Martek ; E Zavadskas; J Antucheviciene -2021- Digitalization as a Strategic Means of Achieving Sustainable Efficiencies in Construction Management. A Critical Review.pdf,” Sustainability (Switzerland), vol. 13, pp. 1–12, 2021.
[24] M. N. Yabanigül and D. Gulec Ozer, “Exploring Architectural Units Through Robotic 3D Concrete Printing of Space-Filling Geometries,” Buildings, vol. 15, no. 1, 2025, doi: 10.3390/buildings15010060.
[25] A. Laureys, R. Depraetere, M. Cauwels, T. Depover, S. Hertelé, and K. Verbeken, “Use of existing steel pipeline infrastructure for gaseous hydrogen storage and transport: A review of factors affecting hydrogen induced degradation,” J Nat Gas Sci Eng, vol. 101, p. 104534, 2022, doi: https://doi.org/10.1016/j.jngse.2022.104534.
[26] A. Keshmiry, S. Hassani, U. Dackermann, and J. Li, “Assessment, repair, and retrofitting of masonry structures: A comprehensive review,” Constr Build Mater, vol. 442, p. 137380, 2024, doi: https://doi.org/10.1016/j.conbuildmat.2024.137380.
[27] K. W. See et al., “Critical review and functional safety of a battery management system for large-scale lithium-ion battery pack technologies,” Int J Coal Sci Technol, vol. 9, no. 1, 2022, doi: 10.1007/s40789-022-00494-0.
[28] E. Cakici, I. Kucukkoc, and M. Akdemir, “Advanced constraint programming formulations for additive manufacturing machine scheduling problems,” Journal of the Operational Research Society, pp. 1–16, doi: 10.1080/01605682.2024.2382867.
[29] G. Robles, A. Stifi, J. Ponz-Tienda, and S. Gentes, “Labor Productivity in the Construction Industry -Factors Influencing the Spanish Construction Labor Productivity-,” International Journal of Civil, Architectural, Structural and Construction Engineering, vol. 8, pp. 999–1008, Jan. 2014.
[30] Z. Jiaying, C. J. C. P., C. Weiwei, and C. Keyu, “Digital Twins for Construction Sites: Concepts, LoD Definition, and Applications,” Journal of Management in Engineering, vol. 38, no. 2, p. 4021094, Mar. 2022, doi: 10.1061/(ASCE)ME.1943-5479.0000948.
[31] A. U. Khan, L. Huang, E. Onstein, and Y. Liu, “Overview of Emerging Technologies for Improving the Performance of Heavy-Duty Construction Machines,” IEEE Access, vol. 10, pp. 103315–103336, 2022, doi: 10.1109/ACCESS.2022.3209818.
[32] W. Yi and A. Chan, “Critical Review of Labor Productivity Research in Construction Journals,” Journal of Management in Engineering, vol. 30, pp. 214–225, Feb. 2014, doi: 10.1061/(ASCE)ME.1943-5479.0000194.
[33] S. P. Stier et al., “Materials Acceleration Platforms (MAPs) Accelerating Materials Research and Development to Meet Urgent Societal Challenges,” Advanced Materials, vol. 2407791, pp. 1–26, 2024, doi: 10.1002/adma.202407791.