(2010). DETERMINATION OF THE OPTIMAL PERIOD FOR PREVENTIVE MAINTENANCE, PRACTICAL APPLICATION IN THE WORKSHOPS OF TECHNICAL INSTITUTE OF BABYLON. , 23(1), 0-0.
. "DETERMINATION OF THE OPTIMAL PERIOD FOR PREVENTIVE MAINTENANCE, PRACTICAL APPLICATION IN THE WORKSHOPS OF TECHNICAL INSTITUTE OF BABYLON". , 23, 1, 2010, 0-0.
(2010). 'DETERMINATION OF THE OPTIMAL PERIOD FOR PREVENTIVE MAINTENANCE, PRACTICAL APPLICATION IN THE WORKSHOPS OF TECHNICAL INSTITUTE OF BABYLON', , 23(1), pp. 0-0.
DETERMINATION OF THE OPTIMAL PERIOD FOR PREVENTIVE MAINTENANCE, PRACTICAL APPLICATION IN THE WORKSHOPS OF TECHNICAL INSTITUTE OF BABYLON. , 2010; 23(1): 0-0.


Journal Management System. Powered by iJournalPro.com