(2012). Approximate Solution for Two Machine Flow Shop Scheduling Problem to Minimize the Total Earliness. , 25(3), 325-332.
. "Approximate Solution for Two Machine Flow Shop Scheduling Problem to Minimize the Total Earliness". , 25, 3, 2012, 325-332.
(2012). 'Approximate Solution for Two Machine Flow Shop Scheduling Problem to Minimize the Total Earliness', , 25(3), pp. 325-332.
Approximate Solution for Two Machine Flow Shop Scheduling Problem to Minimize the Total Earliness. , 2012; 25(3): 325-332.