(2013). The method of ABC and it, s roules in the Determining the cost of the Project constraction sector. , 19(72), 32-68.
. "The method of ABC and it, s roules in the Determining the cost of the Project constraction sector". , 19, 72, 2013, 32-68.
(2013). 'The method of ABC and it, s roules in the Determining the cost of the Project constraction sector', , 19(72), pp. 32-68.
The method of ABC and it, s roules in the Determining the cost of the Project constraction sector. , 2013; 19(72): 32-68.


Journal Management System. Powered by iJournalPro.com