M. Salim, N. (2013). Interaction between the Existing and the New Constructed Tunnels. , 31(19), 3575-3590. doi: 10.30684/etj.31.19A.9
Nahla M. Salim. "Interaction between the Existing and the New Constructed Tunnels". , 31, 19, 2013, 3575-3590. doi: 10.30684/etj.31.19A.9
M. Salim, N. (2013). 'Interaction between the Existing and the New Constructed Tunnels', , 31(19), pp. 3575-3590. doi: 10.30684/etj.31.19A.9
M. Salim, N. Interaction between the Existing and the New Constructed Tunnels. , 2013; 31(19): 3575-3590. doi: 10.30684/etj.31.19A.9


Journal Management System. Powered by iJournalPro.com