(2013). The impact of re-engineering to achieve effective performance level of Ministry of electricity operations/an applied study of process reengineering clean solar cells. , 19(74), 132-158.
. "The impact of re-engineering to achieve effective performance level of Ministry of electricity operations/an applied study of process reengineering clean solar cells". , 19, 74, 2013, 132-158.
(2013). 'The impact of re-engineering to achieve effective performance level of Ministry of electricity operations/an applied study of process reengineering clean solar cells', , 19(74), pp. 132-158.
The impact of re-engineering to achieve effective performance level of Ministry of electricity operations/an applied study of process reengineering clean solar cells. , 2013; 19(74): 132-158.