(2014). Constructing a single sampling plan to inspection product for complete and truncated inspection time with application. , 10(0), 268-276.
. "Constructing a single sampling plan to inspection product for complete and truncated inspection time with application". , 10, 0, 2014, 268-276.
(2014). 'Constructing a single sampling plan to inspection product for complete and truncated inspection time with application', , 10(0), pp. 268-276.
Constructing a single sampling plan to inspection product for complete and truncated inspection time with application. , 2014; 10(0): 268-276.


Journal Management System. Powered by iJournalPro.com