[1] J. I. Van Zante-de Fokkert and de T. G. Kok. The mixed and multi model line balancing problem: a comparison. European Journal of Operational Research, 100 (1997) 399-412.
[2] H. Güden and S. Meral. An adaptive simulated annealing algorithm-based approach for assembly line balancing and a real-life case study. The International Journal of Advanced Manufacturing Technology, 84 (2016) 1539-1559.
[3] S. R. Ashraf and S. N. Abbas. Mixed Model Assembly Line Balancing by Using of Sub-Assembly Parallel Shop. Proceedings of the First International Conference on Industrial Engineering and Management Applications, (2017) 93-97.
[4] S. Akpınar and G. M. Bayhan. A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel workstations and zoning constraints. Engineering Applications of Artificial Intelligence, 24 (2011) 449-457.
[5] S. S. Al-Zubaidy, M. A. Mahmoud and I. D. Khalaf. Balancing Mixed-Model Assembly line in Electronic Industries Company. Engineering and Technology Journal, 34 (2016) 233-244.
[6] A. Scholl. Balancing and sequencing of assembly lines (No. 10881). Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL), 1999.
[7] M. E. Salveson. The Assembly Line Balancing Problem. Journal of Industrial Engineering, 6 (1955) 18–25.
[8] N. T. Thomopoulos. Line balancing-sequencing for mixed-model assembly. Management Science, 14 (1967) 59.
[9] P. M. Vilarinho and A. S. Simaria. ANTBAL: an ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations. International journal of production research, 44 (2006) 291-303.
[10] R. Hwang and H. Katayama. A multi-decision genetic approach for workload balancing of mixed-model U-shaped assembly line systems. International Journal of Production Research, 47 (2009) 3797-3822.
[11] U. Özcan, H. Çerçioğlu, H. Gökçen and B. Toklu. Balancing and sequencing of parallel mixed-model assembly lines. International Journal of Production Research, 48 (2010) 5089-5113.
[12] B. Yagmahan. Mixed-model assembly line balancing using a multi-objective ant colony optimization approach. Expert Systems with Applications, 38 (2011) 12453-12461.
[13] S. AkpıNar, G. M. Bayhan and A. Baykasoglu. Hybridizing ant colony optimization via genetic algorithm for mixed-model assembly line balancing problem with sequence dependent setup times between tasks. Applied Soft Computing, 13 (2013) 574-589.
[14] A. S. Simaria and P. M. Vilarinho. A genetic algorithm based approach to the mixed-model assembly line balancing problem of type II. Computers & Industrial Engineering, 47 (2004) 391-407.
[15] A. V. Raj, J. Mathew, P. Jose and G. Sivan. Optimization of cycle time in an assembly line balancing problem. Procedia Technology, 25 (2016) 1146-1153.
[16] Z. A. Çil, S. Mete and K. Ağpak. Analysis of the type II robotic mixed-model assembly line balancing problem. Engineering Optimization, 49 (2017) 990-1009.
[17] Z. A. Çil, Z. Li, S. Mete, and E. Özceylan. Mathematical model and bee algorithms for mixed-model assembly line balancing problem with physical human–robot collaboration. Applied Soft Computing, 39 (2020) 106394.
[18] W. Zhang, L. Hou, Y.Gan, C. Xu, X. Bu, and H. Lin. Parallel Optimization of the Balancing and Sequencing for Mixed-model Assembly Lines. Manufacturing Technology, 19 (2019) 537-544.
[19] S. Khlil, H. Al-Khazraji, and Z. Alabacy, Solving Assembly Production Line Balancing Problem Using Greedy Heuristic Method. MS&E, 745 (2020) 012068.